1

Design

Before anything is pulled out or ordered. Layout, what moves, and what has a long lead time. The cheapest stage to change your mind.

Good practiceWhole house

The layout, and which wastes, toilets, showers and walls move

Moving a waste or a wall drives cost and every later stage.

Ask: Is anything that drains moving? Check the fall to the sewer before you commit.

ManufacturerKitchen, Laundry

Appliance models: oven, cooktop, rangehood, fridge, dishwasher, washer, dryer

The joinery is built around their cut-outs and clearances.

Ask: Do you have the spec sheet, with cut-out sizes, for every appliance?

Good practiceWhole house

Everything recessed: shaving cabinets, niches, cavity sliders, TV recesses

Each one needs framing, so it has to be known before the carpenter starts.

Ask: Which items sit in the wall rather than on it?

Good practiceWhole house

Order dates for long-lead items: custom joinery, imported tiles and tapware, stone

Some take weeks or months to arrive, longer than the gap to the stage that needs them.

Ask: What has a lead time longer than the time until it is needed?

State ruleWhole house

Which NCC and state rules apply to your work

Livable housing rules, for example, apply differently by state and not at all in some. source

Ask: Have you asked your certifier or builder which rules apply to this job?

2

Framing

Before the carpenter frames or re-frames walls. Anything recessed or wall-hung. The carpenter frames to the actual product.

ManufacturerBathroom and ensuite, Kitchen, Laundry

Which vanities, toilets and cabinets are wall-hung

Wall-hung items need a frame or heavy blocking behind them.

Ask: What is hanging off the wall, and what does its install sheet ask for behind it?

CodeWhole house

Door sizes and cavity sliders

Openings are framed now. Where livable housing rules apply, doors need an 820 mm clear opening. source

Ask: Which doors are sliders, and do the openings meet any rule that applies to you?

Good practiceKitchen, Bathroom and ensuite

Window sill heights against benches, splashbacks, tapware and mirrors

A sill that clips the splashback or the tap is a framing fix, not a tiling one.

Ask: Does every sill clear the bench, splashback and taps under it?

CodeKitchen

Rangehood type, height and duct route

The duct runs through the ceiling or wall before linings. Over gas, the hood must be at least 650 mm above the cooktop. source

Ask: Where does the duct go, and is the hood at least 650 mm above a gas cooktop?

3

Rough-in

Before the plumber and electrician run pipes and cables. Everything that sits in the wall or ceiling. Most variations start here.

ManufacturerBathroom and ensuite, Kitchen, Laundry

Tapware type and brand for every wall mixer and spout

In-wall mixer bodies are brand-specific. The trim must match the body already in the wall.

Ask: Is the trim you want the same brand as the body going in now?

CodeWhole house

Hot water system type and location

It sets pipe runs and power or gas. Water at basins, baths and showers is limited to 50 degrees C. source

Ask: Where does the hot water unit go, and how far is the longest run?

ConventionWhole house

Every power point, switch and light, including power inside joinery

Cables go in before the walls close. Power points are usually about 300 mm high and switches about 1000 to 1200 mm, by convention, not code. source

Ask: Have you walked each room with the furniture: bedsides, desk, TV, benches, robe, appliances?

ManufacturerKitchen

Power, gas and water for each appliance: cooktop, oven, dishwasher, fridge water, microwave

Each sits at a position the appliance's spec sheet sets.

Ask: Is every appliance's point placed to its spec sheet, not a guess?

State ruleWhole house

Data, TV, air conditioning heads and drains, and smoke alarms

All run in the walls and ceiling. Smoke alarm rules differ by state.

Ask: Have you checked your state's smoke alarm rules, and where the AC drain runs?

4

Set-out and screed

Before the floor is screeded and the room is set out. Tile size, bedding depth and falls. Every height in the room is measured from the finished floor this sets.

Good practiceBathroom and ensuite, Kitchen, Laundry

Tile size and layout, at least in general

It sets the joint lines, the cuts and where the waste sits. You can pick the exact colour later.

Ask: Do you know the tile size, so the floor and the waste can be set out? Choose it here

Good practiceWhole house

Thresholds and floor transitions between rooms

Tile next to timber or carpet needs matching heights and a trim.

Ask: Do the finished floor levels line up at every doorway?

6

Linings

Before the walls and ceilings are sheeted. Blocking behind every fixing, and the plasterboard finish level.

Good practiceWhole house

Blocking behind every fixing: towel and grab rails, cabinets, shelves, TV, heavy mirrors, curtain tracks

Once the sheet is on, adding it means cutting the wall. Where livable housing rules apply, grab-rail walls need 12 mm ply or 25 mm noggings. source

Ask: Has every fixing point got blocking, photographed before sheeting?

ConventionWhole house

Plasterboard finish level

Level 4 is standard. Gloss paint, dark colours and raking light need Level 5, which is set when the board is stopped, not painted. source

Ask: Are any walls going gloss, dark, or in raking light?

7

Tiling

Before the tiler sets out. Tile heights, grout, trims and slip ratings. The tiler sets out from these on day one.

Good practiceBathroom and ensuite, Kitchen, Laundry

Tile heights: band, full height or skirting, wall by wall

The tiler sets out from these. Keep one skirting height on every wall; a height that changes is the first thing people notice.

Ask: For each wall: floor to where?

Good practiceBathroom and ensuite, Kitchen, Laundry

Grout colour and type: cement, epoxy or urethane

Pale floor grout tends to go grey; epoxy needs no sealing and suits showers but costs more.

Ask: Have you seen the grout beside the real tile, in the room's own light? Choose it here

Good practiceBathroom and ensuite, Kitchen

Edge trims and their finish, or mitred edges

Trims show on every external corner and should match the tapware finish.

Ask: Which edges get a trim, and in what finish?

Good practiceKitchen, Laundry

Splashback: tile, glass or stone, and its height

It meets the benchtop, the cupboards and the rangehood, so the junctions need deciding.

Ask: Where does the splashback stop at each end and at the top? Choose it here

8

Joinery order

Before cabinets and benchtops are ordered. Measure what was built, not what was drawn, then lock boards, benchtops and appliances.

Good practiceKitchen, Laundry, Bedrooms and robes

Measure what was built before ordering

Drawings can be well out. Laser-measure the finished walls, then order.

Ask: Have the cabinet sizes been checked against a site measure after linings?

Good practiceKitchen, Laundry, Bathroom and ensuite

Benchtop material, thickness, edge and overhangs

The edge profile can move the price more than the colour does.

Ask: Which edge, which thickness, and where are the overhangs? Choose it here

Good practiceKitchen, Laundry, Bedrooms and robes, Bathroom and ensuite

Board colours and finishes, and handles or push-to-open

Boards are ordered with the cabinets.

Ask: Have you seen the board sample next to the benchtop and the floor? Choose it here

Good practiceKitchen

Sink, tap and cooktop on site for the benchtop template

Stone is templated around the real sink, tap and cooktop. Without them, expect a return visit.

Ask: Are the sink, tap and cooktop on site when the templater comes?

ConventionKitchen

Bench height and wall oven height

Benches usually sit 900 to 950 mm, and the top of a wall oven no higher than about 1700 mm, by convention. source

Ask: Have you checked the bench height against the tallest and shortest cook?

9

Painting

Before the painter quotes and starts. Colours, sheen, prep and coats, per surface.

Good practiceWhole house

Colours for each room and surface: walls, ceilings, trims, doors

The painter quotes per surface.

Ask: Have you put real samples on your own walls, in the room's light? Choose it here

ConventionWhole house

Sheen for each surface

Ceilings are usually flat, walls low sheen, and wet areas, trims and doors semi-gloss or gloss.

Ask: Is the sheen written next to every colour in the painter's scope?

ConventionWhole house

Prep and number of coats in the painter's scope

Quotes differ most on prep and coats. Master Painters recommend three coats on new work. source

Ask: Does every quote state the prep and the coats, so you can compare them?

10

Fit-off (can wait)

At the end. The choices you can safely leave late: positions are already fixed.

Good practiceWhole house

Light fittings

Positions were fixed at rough-in, so the fitting itself can be chosen late.

Ask: Do the fittings suit the points already in the ceiling?

Good practiceWhole house

Handles, towel rails, hooks and accessories

The blocking is already in, so these can wait.

Ask: Do the finishes match the tapware?

Good practiceWhole house

Window furnishings and loose furniture

Nothing else depends on them.

Ask: Did the power points land where the furniture went?