Bush Turkey
Plan · Stage 4 of 10 · 6 decisions

Decide before set-out and screed

Before the floor is screeded and the room is set out. Tile size, bedding depth and falls. Every height in the room is measured from the finished floor this sets.

Copies the decisions shown, with a prompt, to paste into ChatGPT, Claude or Gemini.
Good practiceBathroom and ensuite, Kitchen, Laundry

Tile size and layout, at least in general

It sets the joint lines, the cuts and where the waste sits. You can pick the exact colour later.

Ask: Do you know the tile size, so the floor and the waste can be set out? Choose it here

Good practiceBathroom and ensuite, Laundry

Bedding and screed depth

Allow about 40 to 50 mm. It moves the finished floor, and every height in the room is measured from the finished floor.

Ask: Have you allowed 40 to 50 mm for bedding? Your heights are from the finished floor, not the slab.

Good practiceBathroom and ensuite

Wall build-up: sheet, membrane and tile

About 15 to 25 mm is added to the wall face, which moves outlets, niches and set-outs. source

Ask: Have pipe and outlet depths allowed for the finished wall face?

CodeBathroom and ensuite, Laundry

Falls to the waste, and the entry into the shower

Wet-area falls are set by the NCC and AS 3740. Get them wrong and water sits or escapes. source

Ask: Have your tiler and waterproofer agreed the falls and the shower entry?

Good practiceBathroom and ensuite

A finished floor level datum line, marked on the studs

Every fixture height is from the finished floor. Mark it once, then set out from it.

Ask: Is there a datum line on the studs before anything is set out?

Good practiceWhole house

Thresholds and floor transitions between rooms

Tile next to timber or carpet needs matching heights and a trim.

Ask: Do the finished floor levels line up at every doorway?

← Rough-in Waterproofing →

Prompts, not rules. Most choices can wait; these can't, because a later trade builds to them. Code items cite their source; states adopt parts of the NCC differently, so check yours. Your builder, trades, certifier and each product's install sheet decide. Download the list (JSON, CC BY 4.0).