Living and dining: what to decide, and when

Every decision with a deadline for the living and dining, in build order. Whole-house items are included.

Copies the decisions shown, with a prompt, to paste into ChatGPT, Claude or Gemini.
1

Design

Before anything is pulled out or ordered. Layout, what moves, and what has a long lead time. The cheapest stage to change your mind.

Good practiceWhole house

The layout, and which wastes, toilets, showers and walls move

Moving a waste or a wall drives cost and every later stage.

Ask: Is anything that drains moving? Check the fall to the sewer before you commit.

Good practiceWhole house

Everything recessed: shaving cabinets, niches, cavity sliders, TV recesses

Each one needs framing, so it has to be known before the carpenter starts.

Ask: Which items sit in the wall rather than on it?

Good practiceWhole house

Order dates for long-lead items: custom joinery, imported tiles and tapware, stone

Some take weeks or months to arrive, longer than the gap to the stage that needs them.

Ask: What has a lead time longer than the time until it is needed?

State ruleWhole house

Which NCC and state rules apply to your work

Livable housing rules, for example, apply differently by state and not at all in some. source

Ask: Have you asked your certifier or builder which rules apply to this job?

2

Framing

Before the carpenter frames or re-frames walls. Anything recessed or wall-hung. The carpenter frames to the actual product.

CodeWhole house

Door sizes and cavity sliders

Openings are framed now. Where livable housing rules apply, doors need an 820 mm clear opening. source

Ask: Which doors are sliders, and do the openings meet any rule that applies to you?

3

Rough-in

Before the plumber and electrician run pipes and cables. Everything that sits in the wall or ceiling. Most variations start here.

CodeWhole house

Hot water system type and location

It sets pipe runs and power or gas. Water at basins, baths and showers is limited to 50 degrees C. source

Ask: Where does the hot water unit go, and how far is the longest run?

ConventionWhole house

Every power point, switch and light, including power inside joinery

Cables go in before the walls close. Power points are usually about 300 mm high and switches about 1000 to 1200 mm, by convention, not code. source

Ask: Have you walked each room with the furniture: bedsides, desk, TV, benches, robe, appliances?

State ruleWhole house

Data, TV, air conditioning heads and drains, and smoke alarms

All run in the walls and ceiling. Smoke alarm rules differ by state.

Ask: Have you checked your state's smoke alarm rules, and where the AC drain runs?

4

Set-out and screed

Before the floor is screeded and the room is set out. Tile size, bedding depth and falls. Every height in the room is measured from the finished floor this sets.

Good practiceWhole house

Thresholds and floor transitions between rooms

Tile next to timber or carpet needs matching heights and a trim.

Ask: Do the finished floor levels line up at every doorway?

6

Linings

Before the walls and ceilings are sheeted. Blocking behind every fixing, and the plasterboard finish level.

Good practiceWhole house

Blocking behind every fixing: towel and grab rails, cabinets, shelves, TV, heavy mirrors, curtain tracks

Once the sheet is on, adding it means cutting the wall. Where livable housing rules apply, grab-rail walls need 12 mm ply or 25 mm noggings. source

Ask: Has every fixing point got blocking, photographed before sheeting?

ConventionWhole house

Plasterboard finish level

Level 4 is standard. Gloss paint, dark colours and raking light need Level 5, which is set when the board is stopped, not painted. source

Ask: Are any walls going gloss, dark, or in raking light?

9

Painting

Before the painter quotes and starts. Colours, sheen, prep and coats, per surface.

Good practiceWhole house

Colours for each room and surface: walls, ceilings, trims, doors

The painter quotes per surface.

Ask: Have you put real samples on your own walls, in the room's light? Choose it here

ConventionWhole house

Sheen for each surface

Ceilings are usually flat, walls low sheen, and wet areas, trims and doors semi-gloss or gloss.

Ask: Is the sheen written next to every colour in the painter's scope?

ConventionWhole house

Prep and number of coats in the painter's scope

Quotes differ most on prep and coats. Master Painters recommend three coats on new work. source

Ask: Does every quote state the prep and the coats, so you can compare them?

10

Fit-off (can wait)

At the end. The choices you can safely leave late: positions are already fixed.

Good practiceWhole house

Light fittings

Positions were fixed at rough-in, so the fitting itself can be chosen late.

Ask: Do the fittings suit the points already in the ceiling?

Good practiceWhole house

Handles, towel rails, hooks and accessories

The blocking is already in, so these can wait.

Ask: Do the finishes match the tapware?

Good practiceWhole house

Window furnishings and loose furniture

Nothing else depends on them.

Ask: Did the power points land where the furniture went?

Prompts, not rules. Most choices can wait; these can't, because a later trade builds to them. Code items cite their source; states adopt parts of the NCC differently, so check yours. Your builder, trades, certifier and each product's install sheet decide. Download the list (JSON, CC BY 4.0).