The layout, and which wastes, toilets, showers and walls move
Moving a waste or a wall drives cost and every later stage.
Ask: Is anything that drains moving? Check the fall to the sewer before you commit.
Every decision with a deadline for the outdoor and exterior, in build order. Whole-house items are included.
Before anything is pulled out or ordered. Layout, what moves, and what has a long lead time. The cheapest stage to change your mind.
Moving a waste or a wall drives cost and every later stage.
Ask: Is anything that drains moving? Check the fall to the sewer before you commit.
Each one needs framing, so it has to be known before the carpenter starts.
Ask: Which items sit in the wall rather than on it?
Some take weeks or months to arrive, longer than the gap to the stage that needs them.
Ask: What has a lead time longer than the time until it is needed?
Livable housing rules, for example, apply differently by state and not at all in some. source
Ask: Have you asked your certifier or builder which rules apply to this job?
Before the carpenter frames or re-frames walls. Anything recessed or wall-hung. The carpenter frames to the actual product.
Openings are framed now. Where livable housing rules apply, doors need an 820 mm clear opening. source
Ask: Which doors are sliders, and do the openings meet any rule that applies to you?
Before the plumber and electrician run pipes and cables. Everything that sits in the wall or ceiling. Most variations start here.
It sets pipe runs and power or gas. Water at basins, baths and showers is limited to 50 degrees C. source
Ask: Where does the hot water unit go, and how far is the longest run?
Cables go in before the walls close. Power points are usually about 300 mm high and switches about 1000 to 1200 mm, by convention, not code. source
Ask: Have you walked each room with the furniture: bedsides, desk, TV, benches, robe, appliances?
Outdoor power points must be at least 300 mm above the ground. source
Ask: Where do you need power, water and light outside?
All run in the walls and ceiling. Smoke alarm rules differ by state.
Ask: Have you checked your state's smoke alarm rules, and where the AC drain runs?
Before the floor is screeded and the room is set out. Tile size, bedding depth and falls. Every height in the room is measured from the finished floor this sets.
Tile next to timber or carpet needs matching heights and a trim.
Ask: Do the finished floor levels line up at every doorway?
Before the walls and ceilings are sheeted. Blocking behind every fixing, and the plasterboard finish level.
Once the sheet is on, adding it means cutting the wall. Where livable housing rules apply, grab-rail walls need 12 mm ply or 25 mm noggings. source
Ask: Has every fixing point got blocking, photographed before sheeting?
Level 4 is standard. Gloss paint, dark colours and raking light need Level 5, which is set when the board is stopped, not painted. source
Ask: Are any walls going gloss, dark, or in raking light?
Before the tiler sets out. Tile heights, grout, trims and slip ratings. The tiler sets out from these on day one.
P3 is the usual minimum for bathroom floors; P4 or P5 for outdoors, ramps and pool surrounds.
Ask: Does each floor tile carry a published P rating that suits where it goes? Choose it here
Before the painter quotes and starts. Colours, sheen, prep and coats, per surface.
The painter quotes per surface.
Ask: Have you put real samples on your own walls, in the room's light? Choose it here
Ceilings are usually flat, walls low sheen, and wet areas, trims and doors semi-gloss or gloss.
Ask: Is the sheen written next to every colour in the painter's scope?
Quotes differ most on prep and coats. Master Painters recommend three coats on new work. source
Ask: Does every quote state the prep and the coats, so you can compare them?
Most houses are coloured from the roof down, and darker roofs run hotter.
Ask: Do the wall and trim colours work with the roof colour you have? Choose it here
At the end. The choices you can safely leave late: positions are already fixed.
Positions were fixed at rough-in, so the fitting itself can be chosen late.
Ask: Do the fittings suit the points already in the ceiling?
The blocking is already in, so these can wait.
Ask: Do the finishes match the tapware?
Nothing else depends on them.
Ask: Did the power points land where the furniture went?
Prompts, not rules. Most choices can wait; these can't, because a later trade builds to them. Code items cite their source; states adopt parts of the NCC differently, so check yours. Your builder, trades, certifier and each product's install sheet decide. Download the list (JSON, CC BY 4.0).